The first file on the market repair contract began with repair scope, market closures and final invoices. The city then checked the source, heard affected residents and sent a second office to repeat the count.
The current Year third, long dusk window 3 file records 34 work orders with a closure period and a final amount; the previous window records 40. The longer sequence makes the change visible, while each count remains tied to its own dates.
A turning point was the observation that the repair contract lists parts but not the hours stalls must close. It narrowed the discussion from a general claim to a question about how the rule works at the site.
The contractor prices materials and work. Sellers ask the board to disclose how long the aisle will be closed. The shared record is larger than it was at the start, although the parties still assign it different weight.
The service board posts the result and its first operating date. The responsible office has begun the follow-up set by the board, which approved a limited exception with a posted access route.